Click on an image to view a more detailed photographs.
Weather proof instrument power distribution board on sewage treatment plant.
3-phase distribution board replaced and relocated following emergency call to burnt out original unit.
Galvanised steel cable tray installation.
300mm aluminium cable termination enclosure situated on leisure park.
Supply and installation of 4.8m collapsing, foot mounted lighting column. Lighting skip storage area with 2x250watt son floodlights.
Stairwell lighting installation on sewage treatment plant.
Far left enclosure added to process telemetry system. this demonstrates mayhew electricals’ ability to match existing installation standards and materials.
Part of recently completed 300mm galvanised basket tray installation.
Re-furbished flowmeter installation.
Re-located and refurbished process flowmeter installation.
Installation of sewage treatment plant outfall weir position sensors. Construction using grp cable tray, stainless steel fixings and brackets.